Part wall counter notice
Section 4 [of the Party Wall Act 1996 - "Counter Notice"] governs the service of the counter notice by an adjoining owner.
They may require that the work is done differently or in a manner which mitigates the adverse effects on their property. A building owner must take the requirements on board unless they are felt unnecessary, injurious or otherwise difficult. In that case the matter is in dispute and is resolved under the disputes process.
Section 4(1) provides that an adjoining owner who does not wholly agree with a ‘party structure notice’ that has been served by a building owner is entitled to serve the building owner with a counter notice requiring that the building owner may only carry out the notified works in accordance with the specified conditions of the counter notice.
Subsection 4(1)(a) provides that any proposed works by a building owner in respect to a ‘party fence wall’ are carried out in and/or on the wall or structure to the convenience of the adjoining owner.
Subsection 4(1)(b) provides that an adjoining owner who consents in writing to any proposed works being carried out in respect of special foundations can require the building owner to place the foundations at a greater depth than is being proposed. The adjoining owner may also require that the foundations are constructed in a way that will ensure they are sufficiently strong enough to bear the load of any columns of any intended building of the adjoining owner. Note that this subsection provides an adjoining owner with future protection in that they can demand foundations be constructed [to] weight bear the load of ………”any intended building of the adjoining owner.”
Subsection 4(2) provides that an adjoining owner must serve a building owner with a counter notice within one month of the date the notice was served. It must specify the required works to be executed by the building owner and must be accompanied by plans, sections and particulars of the required works.
Subsection 4(3) provides that unless the demands of the adjoining owner would cause injury, unnecessary inconvenience or delay in the party structure notice works being executed, a building owner must comply with the requirements of the counter notice.
[edit] Related articles on Designing Buildings
Featured articles and news
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.